Making healthcare estates future-ready will require urgent addressing of overheating as well as reducing emissions and fabric improvements, technology and maintenance should all play their part, warns WSP’s Andrea Buckley

With net zero targets firmly in place, the NHS has made heat decarbonisation its primary focus. While this is essential to cutting operational carbon, if buildings are assessed through a carbon lens alone there is a risk of creating assets that perform well in winter, yet struggle to remain safe and functional as temperatures rise and extreme weather becomes more common.

NHS England’s climate adaptation strategy makes clear that the health service must both reduce emissions and adapt sites and services to cope in extreme weather, including heatwaves, flooding and worsening air pollution.

The urgency of acting on both fronts has been brought into sharp focus by the intense heatwaves England experienced through the summer of 2026.  The Met Office has verified a new UK June temperature record of 38°C at  Lingwood on 26 June.

NHS England has confirmed that the three busiest months in NHS were all recorded between May and July 2026, with A&E departments recording over 2.46 million attendances in May alone. During the June heatwave, several NHS trusts declared critical incidents as chiller units failed, MRI scanners and radiotherapy machines broke down, and clinical areas became unsafe.

A survey of over 1,100 healthcare workers by the Doctors’ Association UK found that 95.6% reported their workplace was either ‘uncomfortably warm’, ‘very hot’, or ‘dangerously hot’, while 68.3% said patient safety was affected, and 94.1% had no air conditioning or only partial air conditioning. These events demonstrate that climate risk to NHS buildings and services is not a future concern — it is already here.

The net zero requirement is clear

The NHS was the first national health system to commit to net zero: for emissions it controls directly by 2040, and for those it can influence by 2045. NHS England’s 2025 statutory Green Plan guidance requires integrated care boards and trusts to refresh board-approved Green Plans, linking net zero action to patient care, value for money, governance and climate resilience.

The 2025 five-year progress report confirmed the NHS remains on track for its interim direct-emissions target while noting rising climate pressure on infrastructure, staff and finances.

For the NHS estate, the NHS Net Zero Building Standard applies to new-build and major upgrade projects with a cost of £25 million or above that are  subject to HM Treasury business case approval (from pre-strategic outline business case stage), as well as to Neighbourhood Health Centre and New Hospital Programme projects.

The refreshed Green Plan guidance asks trusts to develop full heat decarbonisation plans and phase out existing fossil-fuel heating systems by 2032. That deadline strengthens the case for integrating adaptation alongside decarbonisation, and decisions taken now will shape how buildings perform in both winter and extreme summer heat for decades to come.

Why overheating must be part of the decarbonisation brief — and how to address it

Healthcare buildings are particularly exposed to overheating. They operate long hours, contain heat-generating equipment, serve vulnerable patients and have complex ventilation requirements.

During extreme heat, internal temperatures can affect clinical outcomes, staff wellbeing, medicine storage and critical infrastructure. Some decarbonisation measures can exacerbate this: airtightness and insulation may trap heat gains unless ventilation, shading and night-time purge ventilation strategies are addressed in parallel; heat pump design should consider cooling where clinically appropriate; and solar PV roof layouts should account for green roofs, shading and heat gain.

The core question is not just “how do we remove fossil-fuel heating?” but “how do we create a low-carbon building that remains safe and usable in future climate conditions?”

The best heat decarbonisation strategies are integrated resilience strategies:

  • Fabric upgrades reduce winter heat loss and improve summer comfort when combined with external shading, solar-control glazing and effective ventilation.
  • Heat pumps can replace fossil-fuel boilers and, where suitable, provide low-carbon or reversible cooling.
  • Mechanical ventilation with heat recovery (MVHR) can reduce overheating and improve indoor air quality while recovering heat in winter.
  • Building management systems can optimise heating, cooling, ventilation and occupancy schedules, helping estates teams respond to heat alerts.
  • Cool roofs and reflective surfaces are most effective at reducing local heat island effects, while green roofs, trees, permeable surfaces and shaded external spaces provide biodiversity, water attenuation and amenity co-benefits.

All of these measures are more cost-effective when coordinated with planned roofing works or backlog maintenance rather than delivered as standalone projects.

An improved basis for prioritising investment decisions

Integrating adaptation also improves business cases. It helps identify dependencies and prioritises measures with multiple benefits.

A heat pump scheme may look strong on carbon alone, but if it creates unmanaged cooling demand or fails to address overheating in priority clinical areas, the cost benefit analysis is incomplete. A combined package of fabric improvements, controls, ventilation, low-carbon heat, targeted cooling and solar PV can deliver stronger outcomes across carbon, resilience, safety, wellbeing and cost.

This is important because NHS funding windows are limited, and uncertain, with any disruption for works being difficult in live healthcare environments, so every intervention surely has to work harder: roof works should consider PV, insulation, reflectivity, drainage and green infrastructure; windows should consider daylight, ventilation, security and solar gain; and plant replacement should consider heating, hot water, cooling, controls, redundancy and future electrical capacity. Backlog maintenance, net zero and adaptation should be sequenced as one joined-up route map.

Central to this sequencing is a considered approach to cooling. The NHS needs a cooling hierarchy:

  • ensure existing systems are properly maintained and controlled, for example, that heating systems such as radiators are not left operating during summer months
  • reduce heat gains first, use passive and natural ventilation where clinically suitable, optimise controls, recover and redistribute energy where possible, and only then apply efficient active cooling where needed for patient safety, clinical function or critical infrastructure.

Let’s make ‘Net zero’ also mean ‘climate-ready’

For NHS buildings, the next phase of decarbonisation cannot be about carbon reduction alone. The same buildings that must help meet net zero duties must also protect patients, staff and services during increasingly frequent and severe heatwaves.

By combining low-carbon heating with passive cooling, ventilation, shading, controls, renewable energy and site resilience measures, NHS organisations can create buildings that are cleaner to run, safer to occupy and more dependable in a warmer climate.

That is the real test of a future-ready healthcare estate: not just whether it emits less carbon, but whether it can continue to deliver care when extreme weather puts more pressure on the system inside.

NHS estates and sustainability teams should therefore build climate adaptation into every heat decarbonisation assessment now, so investment decisions made today create buildings that are both net zero-aligned and ready for the climate they will face tomorrow.

For more information on the issues raised, please contact netzeroprocure@wsp.com

  • Andrea Buckley will be one of the panellists discussing Decarbonising the NHS in our Climate Solutions Theatre at elementalLONDON on 25 November. For more details of the show on 25-26 November, and the full content programme, see www.elementallondon.show

Be part of elementalLONDON 2026
Join us at Excel London, 25–26 November as elementalLONDON and London Build come together for two days of industry insight, innovation and networking.

Get your free ticket